Description
We plan to start construction March 1, 2026 and finish infrastructure 6-8 months. The new buyer can go ahead and start engineering and permitting their site during this process. We are having the main spine road come in directly at the traffic light into the development. Great access and exposure. The seller is installing all of the main roads within the development, curb cuts, utilities stub out and master stormwater. The site is cleared as well. These lots will be pad ready. 3 available locations in this site.
-
0BEDS
-
0.57ACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
We plan to start construction March 1, 2026 and finish infrastructure 6-8 months. The new buyer can go ahead and start engineering and permitting their site during this process. We are having the main spine road come in directly at the traffic light into the development. Great access and exposure. The seller is installing all of the main roads within the development, curb cuts, utilities stub out and master stormwater. The site is cleared as well. These lots will be pad ready. 3 available locations in this site.
© 2026 Coastal Carolinas Association of REALTORS® MLS. All rights reserved. IDX information is provided exclusively for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information is deemed reliable but is not guaranteed accurate by the MLS or Living South Realty. The data relating to real estate for sale or lease on this web site comes in part from CCAR. Real estate listings held by brokerage firms other than Living South Realty are marked with the CCAR logo or an abbreviated logo and detailed information about them includes the name of the listing broker.
Data last updated: 2026-05-19T00:20:34.11.